SEER POWER

Project Power Solutions

Power Solutions Built to Win Projects.

You bring the opportunity. We provide engineering, solution design, bid support and delivery coordination.

Engineering team reviewing a project drawing in a generator workshop

PROJECT SUPPORT PROCESS

From Project Inquiry to Successful Delivery

You identify the project opportunity.
We support it through every technical and commercial stage.

Project Lead process illustration 01

Project Opportunity

Requirements process illustration 02

Requirements Review

Technical Review process illustration 03

Technical Assessment

Joint Solution process illustration 04

Solution Development

Bid Support process illustration 05

Bid Support

Delivery process illustration 06

Production & Delivery

Project solutions

Industry-Specific Power Solutions

See how we match generator systems, technical support and project documentation to each application.

Two white sound-attenuated generator enclosures in a factory hall

What the Project Requires

  • Reliable standby power for critical loads
  • Coordinated Standby Generation and Automatic Transfer During Utility Outages
  • Complete technical submittals and test documentation

What SEER POWER Provides

  • Generator Sizing, Capacity and Redundancy Planning
  • Integrated Generator Sets, Automatic Transfer Switches and Paralleling Controls
  • Factory test reports and technical drawings

Dealer Benefits

  • Prepare quotations faster
  • Reduce Sizing and Configuration Errors
  • Support a smoother technical approval process

Project references

Global Project Success Stories

Explore selected generator projects
by region and application.

Project Africa Lagos Oil Gas Field

Oil and Gas Field Power Project, Lagos

Project Africa Djibouti Container Project

Containerized Generator Project, Djibouti

Project Africa Somalia Container Project

Containerized Generator Project, Somalia

Project Africa Tanzania Power Station

Power Station Generator Project, Tanzania

Project Africa Tanzania Nickel Mine

Nickel Mine Power Project, Tanzania

04 / FAQ

Frequently Asked Questions

Find answers about project requirements, quotations, delivery coordination and solution support.

01 What information should I send first?

Send the load list or required output, voltage, frequency, application, site location, operating mode and target delivery date. If the specification is incomplete, send what you have. We can identify the remaining technical questions.

02 How is generator size reviewed?

We review continuous load, motor starting current, load steps, duty, redundancy, altitude, ambient temperature and planned future capacity. Final selection depends on confirmed load data and the agreed operating sequence.

03 Can the proposal include ATS or parallel operation?

Yes, where the project calls for it. The proposal can cover ATS requirements, multiple generator sets and parallel operating logic. The final scope must confirm the number of sets, switching sequence, control requirements and connection with the site system.

04 What documents are available during technical review?

The project document package can include technical data, general arrangement drawings, wiring information and factory test records. The exact list is confirmed with the quotation because it depends on the selected configuration and project requirements.

05 How do you handle hot, dusty or remote sites?

We review temperature, altitude, dust, ventilation, fuel autonomy and maintenance access before recommending the enclosure and cooling arrangement. Any special filtration, tank or container requirement should be stated before the configuration is finalized.

06 What support is available after the order?

Documentation, remote technical guidance and commissioning information can be included in the agreed scope. On-site support, spare parts and service arrangements depend on the destination and the commercial agreement.